Detail Cantuman

Image of ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL

Tugas Akhir DIII

ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL

XML

AN ANALYSIS TO THE INPATIENT ASSEMBLING WORKER NECESSITY TOWARD THE WISN METHOD IN RSUD DR. H. SOEWONDO KENDAL] As the results are 286 weekdays. 1.675 hour/year, 6,25 hours/day. The workloud standard for inpatient assembling worker is 14.154,929 minutes/year. The necessity amount for inpatient assembling worker by WISN formula is 2 person.


Informasi Detail

Pernyataan Tanggungjawab
Dr. Rr. Sri Endang Pujiastuti, SKM, MNS ., Subinarto, M.Kom
Pengarang
ADE YOGYANTO - Pengarang Utama
NIM
P1337437114019
Bahasa
Indonesia
Deskripsi Fisik
67 HLM, 2 IMAGES, 8 table, 29 CM
Dilihat sebanyak
438
Penerbit PRODI DIII RMIK : POLTEKKES KEMENKES SEMARANG.,
Edisi
Subjek
Klasifikasi
081 019 2017

Lampiran Berkas

Citation
ADE YOGYANTO. (2017).ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL().POLTEKKES KEMENKES SEMARANG:PRODI DIII RMIK

ADE YOGYANTO.ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL().POLTEKKES KEMENKES SEMARANG:PRODI DIII RMIK,2017.Tugas Akhir DIII

ADE YOGYANTO.ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL().POLTEKKES KEMENKES SEMARANG:PRODI DIII RMIK,2017.Tugas Akhir DIII

ADE YOGYANTO.ANALISIS KEBUTUHAN TENAGA KERJA ASSEMBLING RAWAT INAP BERDASARKAN TEORI WORKLOAD INDICATORS OF STAFFING NEED (WISN) DI RSUD DR. H. SOEWONDO KENDAL().POLTEKKES KEMENKES SEMARANG:PRODI DIII RMIK,2017.Tugas Akhir DIII



Dirujuk oleh 0 dokumen